AGENDA
Ordinary meeting of the
Nelson Regional Sewerage Business Unit
Friday 2 August 2024
Commencing at 9.30a.m.
Council Chamber
Floor 2A, Civic House
110 Trafalgar Street, Nelson
Membership:
Chairperson Tasman District Councillor Kit Maling
Deputy Chairperson Nelson City Councillor Tim Skinner
Members Tasman District Councillor Barry Dowler
Nelson City Councillor Kahu Paki Paki
Independent Member Tallat Mehmood
Industry Representative (non-voting) Philip Wilson
Iwi Representative Aneika Young
Quorum: 3
The Nelson Regional Sewerage Business Unit (NRSBU) (NDOCS-1974015928-495) is a joint committee of Nelson City and Tasman District Councils. Operation of the NRSBU is governed by a Board, as established by a Memorandum of Understanding (NDOCS-1974015928-495).
· To manage and operate the wastewater treatment facilities at Bells Island and the associated reticulation network efficiently and in accordance with resource consent conditions to meet the needs of its customers.
· The Councils are agreed that the responsibility for all management and administrative matters associated with the NRSBU operation shall be with the Board, and in particular the Board shall without the need to seek any further authority from the Councils:
o Operate a bank account for the Business Unit;
o Comply with the Procurement Policy of the Administering Council;
o Enter into all contracts necessary for the operation and management of the Business Unit in accordance with the approved budgets and intent of the Business Plan;
o Authorise all payments necessary for the operation and management of the Business Unit within the approved budgets and intent of the Business Plan;
o Do all other things, other than those things explicitly prohibited by this Memorandum of Understanding or relevant statutes, that are necessary to achieve the objectives as stated in the Strategic Plan, Asset Management Plan or Business Plan approved by the Councils;
o Comply with the Health and Safety Policy and requirements of the administering Council
· Contribute to the sanitary services assessment process of the Councils
· Contribute to and comply with the waste management plans of the Councils
· Contribute to the development of the Councils’ Development and Financial Contribution policies
· Contribute to the Councils’ Regional Policy Statement and Regional Plan Reviews
· Develop and keep under review an appropriate contract for the delivery of waste collection and disposal services with each of its customers
· Follow generally accepted accounting practices
· Follow good employment practices
· Any other matters under the areas of responsibility of the Business Unit and detailed in the Memorandum of Understanding.
· All recommendations to Council will be subject to adoption of an equivalent resolution by the other Council, unless it is a matter specific to one Council only.
· The Memorandum of Understanding governing the NRSBU allows for either six or seven members to be appointed. The quorum at a meeting is either three (if six members are appointed), or four (if seven members are appointed), including at least one from each local authority.
· The Standing Orders of the Council providing administration to the committee will be applied at each meeting.
· The Chairperson will not have a casting vote.
· Copies of minutes of meetings of the Joint Committee will be retained by each Council for record keeping purposes.
Nelson Regional Sewerage Business Unit
2 August 2024
1. Apologies
An apology has been received from Nelson City Councillor K Paki Paki
2. Confirmation of Order of Business
3.1 Updates to the Interests Register
3.2 Identify any conflicts of interest in the agenda
Document number M20549
Recommendation
That the Nelson Regional Sewerage Business Unit 1. Confirms the minutes of the meeting of the Nelson Regional Sewerage Business Unit, held on 3 May 2024, as a true and correct record. |
6. NRSBU General Manager Update Report August 2024 10 - 130
Document number R28627
Recommendation
That the Nelson Regional Sewerage Business Unit 1. Receives the report NRSBU General Manager Update Report August 2024 (R28627) and its attachment (1080325921-753); and 2. Approves the final Nelson Regional Sewerage Business Unit 2024 – 2034 Activity Management Plan (1080325921-753). |
Recommendation to Council
That the Nelson City Council and Tasman District Council 1. Adopts the final Nelson Regional Sewerage Business Unit 2024 – 2034 Activity Management Plan (1080325921-753). |
Confidential Business
Recommendation
That the Nelson Regional Sewerage Business Unit
1. Excludes the public from the following parts of the proceedings of this meeting.
2. The general subject of each matter to be considered while the public is excluded, the reason for passing this resolution in relation to each matter and the specific grounds under section 48(1) of the Local Government Official Information and Meetings Act 1987 for the passing of this resolution are as follows:
Item |
General subject of each matter to be considered |
Reason for passing this resolution in relation to each matter |
Particular interests protected (where applicable) |
1 |
Nelson Regional Sewerage Business Unit Land Purchase |
Section 48(1)(a) The public conduct of this matter would be likely to result in disclosure of information for which good reason exists under section 7 |
The withholding of the information is necessary: · Section 7(2)(i) To enable the local authority to carry on, without prejudice or disadvantage, negotiations (including commercial and industrial negotiations) |
2 |
Nelson Regional Sewerage Business Unit Solar Development Update Report |
Section 48(1)(a) The public conduct of this matter would be likely to result in disclosure of information for which good reason exists under section 7 |
The withholding of the information is necessary: · Section 7(2)(b)(ii) To protect information where the making available of the information would be likely unreasonably to prejudice the commercial position of the person who supplied or who is the subject of the information |
3 |
Nelson Regional Sewerage Business Unit - Best Island Beneficial Reuse Facility Update |
Section 48(1)(a) The public conduct of this matter would be likely to result in disclosure of information for which good reason exists under section 7 |
The withholding of the information is necessary: · Section 7(2)(h) To enable the local authority to carry out, without prejudice or disadvantage, commercial activities |
Nelson Regional Sewerage Business Unit Minutes - 3 May 2024
Minutes of a meeting of the
Nelson Regional Sewerage Business Unit
Te Rōpū ā-Rohe Para, Whakatū / Te Tai o Aorere
Held in the Council Chamber, Floor 2A, Civic House, 110 Trafalgar Street, Nelson on Friday 3 May 2024, commencing at 9.30a.m.
Present: Tasman District Councillor K Maling (Chairperson), Nelson City Councillors T Skinner (Deputy Chairperson) and K Paki Paki, Independent Member T Mehmood, Iwi Representative A Young and Industry Representative (non-voting) P Wilson
In Attendance: Tasman District Council Group Manager Community Infrastructure (R Kirby), Nelson City Council Acting Group Manager Infrastructure (D Light), General Manager Regional Services (N Clarke), Team Leader Governance (R Byrne) and Governance Adviser (A Bryce)
Apologies : Tasman District Councillor B Dowler
1. Apologies
Resolved RSBU/2024/004 |
|
|
That the Nelson Regional Sewerage Business Unit 1. Receives and accepts the apology from Tasman District Councillor Barry Dowler. |
Paki Paki/Skinner Carried |
2. Confirmation of Order of Business
There was no change to the order of business.
3. Interests
There were no updates to the Interests Register, and no interests with items on the agenda were declared.
4. Public Forum
There was no public forum.
5. Confirmation of Minutes
5.1 1 March 2024
Document number M20466, agenda pages 6 - 8 refer.
Resolved RSBU/2024/005 |
|
|
That the Nelson Regional Sewerage Business Unit 1. Confirms the minutes of the meeting of the Nelson Regional Sewerage Business Unit, held on 1 March 2024, as a true and correct record. |
Skinner/Mehmood Carried |
6. General Managers Update Report
Document number R28499, agenda pages 9 - 19 refer.
Attendance: Philip Wilson joined the meeting at 9.40a.m.
General Manager Regional Services, Nathan Clarke and Operations Manager Regional Services, Brad Nixon, took the report as read and provided an update around a small overflow incident and the completion of a section of pipe upgrade under SH6. They answered questions on budgets, a wind monitoring app that is in the final stages, robust response plans and Nelson Pine reuse opportunities.
Accountant, Andrew Bishop, answered questions on capital costs agreements, income through the trade waste agreement, operational cost variables and cash flow.
Resolved RSBU/2024/006 |
|
|
That the Nelson Regional Sewerage Business Unit 1. Receives the report General Managers Update Report (R28499) and its attachment (1080325921-898). |
Skinner/Mehmood Carried |
7. Designation of NRSBU Facilities
Document number R28496, agenda pages 20 - 25 refer.
Operations Manager Regional Services, Brad Nixon, took the report as read and answered questions on designation requirements, iwi engagement and consultation.
Resolved RSBU/2024/007 |
|
|
That the Nelson Regional Sewerage Business Unit 1. Receives the report Designation of NRSBU Facilities (R28496); and 2. Confirms the intent to issue Notifications of Requirement for designation of its facilities under s168A of the Resource Management Act 1991. |
Recommendation to Nelson City Council and Tasman District Council |
|
|
That the Nelson City Council and the Tasman District Council Operations Committee 1. Receives the report Designation of Nelson Regional Sewerage Business Unit Facilities (R28496); and 2. Endorses the Nelson Regional Sewerage Business Unit to issue Notifications of Requirement for designation of its facilities under sections 168 and 168A of the Resource Management Act 1991; and 3. Delegates authority for the signing of the Form 18 applications for Notification of Requirement as required under the Resource Management Act 1991 to the General Manager - Regional Services. |
Skinner/Paki Paki Carried |
8. Nelson Regional Sewerage Business Unit Long Term Plan Submission Feedback Report
Document number R28423, agenda pages 26 - 34 refer.
General Manager Regional Services, Nathan Clarke, took the report as read and tabled additional submissions (1080325921-914).
Resolved RSBU/2024/008 |
|
|
That the Nelson Regional Sewerage Business Unit 1. Receives the report Nelson Regional Sewerage Business Unit Long Term Plan Submission Feedback Report (R28423) and its attachment (1080325921-899); and 2. Confirms the Operational and Capital budgets outlined in the Nelson Regional Sewerage Business Unit Activity Management Plan 2024-2034 (1080325921-753) and the 2024/2025 Nelson Regional Sewerage Business Unit Business Plan (1080325921-246). |
Recommendation to Nelson City Council and Tasman District Council |
|
|
That the Nelson City Council and Tasman District Councils 1. Notes that there are no changes to the 2024/2025 Nelson Regional Sewerage Business Unit Business Plan (1080325921-246) adopted to populate the Nelson City Council and Tasman District Council 2024 – 2025 Annual Plans; and 2. Notes that there are no changes to the Nelson Regional Sewerage Business Unit Activity Management Plan 2024-2034 (1080325921-753) adopted to populate the Nelson City Council and Tasman District Council 2024 – 2034 Long Term Plans. |
Mehmood/Skinner Carried |
|
|
Attachments 1 1080325921-914 Nelson City Council LTP Submissions Relevant to NRSBU |
There being no further business the meeting ended at 10.36a.m.
Confirmed as a correct record of proceedings by resolution on (date)
Resolved |
|
Item 6: NRSBU General Manager Update Report August 2024
Nelson Regional Sewerage Business Unit
2 August 2024
Report Title: NRSBU General Manager Update Report August 2024
Report Author: Nathan Clarke - General Manager Regional Sewerage and Landfill
Report Authoriser: Alec Louverdis - Deputy Chief Executive / Group Manager Infrastructure
Report Number: R28627
1. Purpose of Report
1.1 This report is an update by the General Manager (GM) on activities undertaken to 30 June 2024 by the Nelson Regional Sewerage Business Unit (NRSBU).
1.2 The report also includes a recommendation to adopt and recommend to Nelson City Council and Tasman District Council the 2024 – 2034 Nelson Regional Sewerage Business Unit Activity Management Plan (AMP).
Recommendation to Nelson City Council and Tasman District Council
That the Nelson City Council and Tasman District Council 1. Adopts the final Nelson Regional Sewerage Business Unit 2024 – 2034 Activity Management Plan (1080325921-753). |
3. Background and Discussion
3.1 The Operations and Maintenance contract is running smoothly.
3.2 There were 4 odour notifications for the period to the end of June 2024.
3.3 Total Income to 30 June 2024 finished significantly behind budget by $1,409,514, with a total Net Income below budget by $1,975,472
4. Health and Safety
4.1 Health and Safety (H&S) for the operations contract is being managed well, and no significant safety issues are currently outstanding, the H&S Dashboard is now up and running and a copy is attached.
4.2 Health and Safety Event Register:
Classification |
Date |
Details |
Follow up actions |
Close Call (Near Miss) |
11/04/2024 |
During a weather event access to SCADA was prevented due to a limit on license availability |
Called Nelmac SCADA on call operator who advised this has occurred in the past and if the issue persisted, he could gain access. - escalated to NRSBU and more licenses are likely to be assigned |
Injury |
17/04/2024 |
I lifted off an old pressure pump and then proceeded to install the bigger new pump that I didn't think was that heavy until I lifted it onto the concrete plinth, it wasn't until I got the pump on the plinth that I felt my back was a bit sore. |
Review of job task allocation and planning to identify heavy lifts. Highlights the need for utilising the hiab on site – recertification is underway. |
Incident |
16/04/2024 |
Mower struck power cord in Grass, power cord was for site portacom office that was shifted into position two weeks ago. Power lead was plugged into portacom and run across the adjacent container roof, to the power outlet. high winds late last week must have knocked the excess cable off the roof of the container into the long grass |
Electrician repaired power cord. Power cord secured to prevent future recurrence. Communicated need to ensure electrical leads are secured in place to prevent them moving. |
Hazzard ID (Improve It) |
11/06/2024 |
DAF sump protection is poor. Blows out walkway mesh every time the sump overloads. A gentle press with your foot can tip It into sump with potential for decent injury if walked on. |
Identified a simple off the shelf scruffy done would fix the issue. This was promptly installed and completed |
Incident |
13/06/2024 |
Songer P2 faulted and could not be reset remotely. Electrician attended site at 8am to find the VFD had blowen up, door and HMI of drive was hanging off and inside pumpstation smelled of burnt electronics. |
Event has been resolved and new VFD ordered / installed VFD inspected by supplier, no obvious failure cause so attributed to age |
Incident |
17/06/2024 |
While pigging the Primary Clarifier was cleaning the pig basket in the sludge tank for over 40mins and started to get headache due to not having any odour extractor available. |
A temporary odour extraction has been installed connecting the tank to the ATAD system - this will be sufficient until the new tank is completed. |
4.3 Nelmac have inducted 29 new personnel to NRSBU sites during the period to the end of June 2024.
4.4 The following training was completed during the report period:
Month |
Training Type/details |
No of Staff |
Apr 24 |
Lab calibration and traceability |
1 |
May 24 |
Safe Work at Heights |
1 |
Jun 24 |
N/A |
1 |
Table 1: NRSS Operations and Maintenance Contract Training Completed
4.5 The following audit/interaction activities were completed during the report period:
Month |
Audits |
Prestarts |
Tailgates |
Apr 24 |
0 |
4 |
1 |
May 24 |
1 |
4 |
0 |
Jun 24 |
1 |
4 |
1 |
Table 2: Table 2: NRSS Operations and Maintenance Contract H&S Interactions Completed
5. Risk
5.1 NRSBU manages risks to ensure the performance of the Nelson Regional Sewerage Scheme (NRSS). The following section discusses three significant risks that NRSBU is managing.
5.2 The Wastewater Conveyancing System
5.2.1 The regional rising main is being duplicated and upgraded to improve maintainability and to increase capacity from the Richmond catchment. This upgrade will increase the flow rate from Richmond which in turn result in additional flows entering the Bell Island WWTP.
5.2.2 In addition to the additional flows expected from the Richmond catchment as a result of the rising main upgrade, NRSBU has requested information regarding flow projections from NCC and TDC for the next 20 years. This correspondence is requested annually and recently meetings between NCC and NRSBU has suggested that the flows being received by NRSBU during rainfall events is higher than the capacity contracted to Nelson City Council.
5.2.3 The consequence of these issues is a risk that the capacity of the Bell Island facility will need to be increased. The largest constraint faced by the Bell Island treatment plant is the discharge consent discharge capacity and there is a risk that NRSBU will exceed the discharge capacity more frequently in future as a result of the rising main upgrade.
5.3 Operational Staff resilience
5.3.1 The NRSBU operations and maintenance contractor (Nelmac) and has two site staff who are approaching or past retirement age. These staff have provided advanced notification of their intent to retire.
5.3.2 It is recognised that recruitment for qualified and experienced wastewater operators is difficult within New Zealand. There is a risk that retirement could leave NRSBU lacking in operational capacity for a prolonged period of time.
5.3.3 NRSBU has asked Nelmac to prepare a succession plan to reduce risk of staffing shortage and loss of NRSS specific knowledge when these staff choose to retire.
5.4 The electrical power supply to Bell Island remains a risk to NRSBU. The Business Unit has installed diesel generators on Bell Island to mitigate the risk to the continuity of service, but the consequence would be a significant monetary cost for diesel for the duration of a major lines failure event. NRSBU is currently working on an option to enable a secondary supply line in conjunction with other power activities on the island, however the required additional investment from NRSBU.
6. Operations & Maintenance
6.1 Operational performance of the Nelson Regional Sewerage Scheme (NRSS) continued at a high level.
6.2 The preliminary operating costs against the Target Outturn Cost (TOC) for the 2023/2024 year were above the NRSBU 2023/2024 business plan forecast budget.
6.3 Graph of progress against TOC:
Figure 1: Expenditure against forecast - NRSS O&M Contract
6.4 Between March to May costs incurred under the maintenance contract were higher than forecast. This was primarily driven by increase sampling and monitoring requirements for the start of the new biosolids application consent, increased costs associated with poor pond health, and some unforeseen heavy maintenance costs around the treatment plant.
6.5 Issues experienced on the inlet milliscreen drums late last year have not recurred, with only inspections and preventative maintenance being completed since.
6.6 The replacement drum has been installed, with the old drum sent to the manufacturers to enable assessment for repair suitability with the intent of maintaining as a spare.
6.7 Odour
6.7.1 There were four odour notifications for the period to end of June 2024.
6.7.2 All odour notifications were reviewed as soon as possible after notification was received.
6.7.3 In each case the source was considered, and one odour notification was confirmed to have come from biosolids application on Rabbit Island. The other three were considered likely to be related to biosolids application, however, were unable to be verified.
6.8 Wastewater overflow
6.8.1 No wastewater overflows occurred this period.
6.9 Beneficial reuse of Resources
6.9.1 No application of treated effluent to land has occurred during the period.
6.9.2 25,000m3 of treated effluent has been processed through the ultra-filtration (UF) plant for re-use onsite during the last 3 months.
6.9.3 No supply of UF treated wastewater to Greenacres occurred during the period.
6.9.4 NRSBU applied 10,500 m3 of Biosolids between January and March 2024. This equates to 24 tonnes of Nitrogen for fertiliser to the Motoroa/Rabbit Island pine forests.
7. Projects
7.1 Works recently completed:
7.1.1 Inlet works support props
7.1.2 Best Island pond fencing
7.1.3 Pond level and DO monitoring
7.1.4 Workshop/facilities upgrade:
Figure 2: New workshop/facilities building
Figure 3: New workshop/facilities building
7.2 Regional Rising main upgrade
7.2.1 Sections 1 to 4 Progress:
· Works on Whakatu foreshore completed, including structural lining of pipe under SH6
· Pipe installation from SH6 to Saxton Creek completed, including connection to Alliance.
· Works have commenced on the pipeline installation on Beach Rd
· The liner to join the Beach Rd & Whakatu foreshore works is programmed for installation in late August to early September
7.2.2 Sections 5 to 7 Progress:
· Works are now fully completed, including within the Heslops site on Kotua Place.
7.2.3 Heslops were highly complementary of the works completed by NRSBU contractors through their site. Both Chings (Section 5) and Hunter Civil (Section 4) have ensured minimised disruption and clear communications with Heslops during their time there.
7.2.4 NRSBU has gone to Registration of Interest respondents with a Request for Tender (RfT) for a contractor to complete the duplicated rising main connections at Richmond and Saxton pump stations.
7.2.5 To enable a shorter works delivery programme NRSBU will direct procure long lead time items such as valves, actuators and flow meters.
7.3 Other Works Underway
7.3.1 Moturoa/Rabbit Island biosolids storage tanks odour extraction and biofilter design.
7.3.2 Bell Island biosolids tank renewal.
Figure 4: Biosolids tank renewal works underway
7.3.3 Bell Island sludge tank construction
Figure 5: Completed foundation earthworks for the new sludge storage tank
7.3.4 Bell Island aeration system renewal design.
7.3.5 Bell Island secondary treatment system expansion design.
7.3.6 Storm pump, valving and pipework renewal at Airport pumpstation.
7.3.7 Storm pump and non-return valve renewal at Richmond pumpstation.
7.3.8 Bell Island chamber cover renewals.
7.3.9 Wakatu pump station overflow discharge pipework installation.
7.3.10 Wakatu pump station upgrade and overflow screen installation design.
7.3.11 Bell Island inlet works isolation valve installation.
7.3.12 Monaco to Bell Island concrete rising main condition assessment and fittings renewal.
7.3.13 Bell Island concrete gravity pipe renewal investigations.
7.3.14 Songer pump station riser renewals.
7.3.15 Moturoa/Rabbit Island biosolids storage tank level sensors and valve actuation installation.
7.3.16 Asset information upgrade.
8. Finance
8.1 These finances are not end of year finances, rather they reflect operational finances excluding end of year wash-up, valuation changes, etc.
8.2 The finalised end of year finance report will be submitted for approval in September 2024.
8.3 The total income for the year ending 30 June 2024 is $1,975,472 behind budget.
Figure 6: NRSBU Financial Data to 30 June 2024
8.4 Income
8.4.1 Preliminary fixed recoveries year to date under budget by $699,000.
8.4.2 The variable income year to date is under budget by $737,032.
8.5 Expenditure
8.5.1 Operating and Maintenance expenses are over budget by$427,552.
8.5.2 Interest was $307,000 over budget due to higher interest rates.
8.6 This under recovery in fixed contributions results from changes to interest rates used in the charging model versus the budget and the timing of setting these interest rates. The budget process used means there is a significant time difference during which changes to interest rates can occur.
8.7 The under recovery in variable contributions relates to the 2023/24 financial year being very dry, and therefore the flow charges to the customers were significantly below budgeted inflow. (flows in 2023/24 were 5.441 million m3 compared to 7.213 million m3 in 2022/23)
8.8 Maintenance costs are above budget due a range of activities including heavy maintenance activities, purchase of pond emergency response chemicals and establishment costs for the new biosolids consent.
8.9 Finalised annual financial accounts will be presented in the September NRSBU meeting, including asset revaluations.
9. Activity Management Plan
9.1 At the 3 May 2024 NRSBU meeting the Joint Committee resolved to confirm the budgets included in the Nelson Regional Sewerage Business Unit AMP, along with recommending to NCC and TDC to note that there were no changes to the AMP from the versions adopted to populate the NCC and TDC AMPs following consultation on the Long Term Plan.
9.2 A further recommendation is required for the two councils to adopt the Nelson Regional Sewerage Business Unit AMP as the final version. The recommendation is included in this report.
10. Conclusion
10.1 Business Unit operation has been good from an environmental perspective with high levels of compliance, no wastewater overflows and delivery a large number of capital projects.
10.2 The exception to the good performance is the fixed and variable incomes being significantly lower than budgeted. This is leading to a significant shortfall in revenue. The variable income is lower than budget due to the dry summer resulting in lower than anticipated inflows, which will correct at year end with a wash-up charge to the four major customers.
10.3 The result of the shortfall is a lower than expected surplus. This trend was identified in the first quarter and has continued throughout the year.
10.4 For the scheme owners the lower variable revenue means that they as customers have been making savings, and this will partly compensate for the lower annual surplus projected.
Important considerations for decision making |
11.1 Fit with Purpose of Local Government The NRSBU is a joint committee constituted pursuant to the provisions of Schedule 7 to the Local Government Act 2002 and contributes to the four Local Government well-beings of social, economic, environmental, and cultural. |
11.2 Consistency with Community Outcomes and Council Policy Reporting on management and operations of Council infrastructure is a common practice, and helps provide certainty for service delivery to meet the goals of Long Term Plans. |
11.3 Risk This report allows the NRSBU board to monitor and review the ongoing operations of the NRSBU. The report considers risks from health and safety and compliance, and with resource consents. |
11.4 Financial impact This report summarises financial performance against budgets, and has a minor impact on costs associated with reducing operational and performance risk from foreseeable changes to the operations contractor’s labour force. |
11.5 Degree of significance and level of engagement The NRSBU is a Joint Committee of the two Councils and its activities are included in the Long-term Plans and Annual Plans of each Council. Consultation is undertaken by both Councils in the preparation and adoption of these plans |
11.6 Climate Impact The NRSBU is a Joint Committee of the two Councils and its activities are included in the Long-term Plans and Annual Plans of each Council. Consultation is undertaken by both Councils in the preparation and adoption of these plans. Climate mitigation and adaptation actions are included in the capital works programme in the NRSBU Business Plan |
11.7 Inclusion of Māori in the decision making process No engagement with Māori has been undertaken in preparing this report. No engagement with Māori has been undertaken in preparing this report but iwi have representation on the Board. |
11.8 Delegations The Councils are agreed that the responsibility for all management and administrative matters associated with the NRSBU operation shall be with the Board, and in particular the Board shall without the need to seek any further authority from the Councils: Enter into all contract necessary for the operations and management of the Business Unit in accordance with approved Budgets and the intent of the Business Plan. Authorise all payments necessary for the operations and management of the business unit within the approve budgets and the intent of the Business Plan Do all other things, other than those things explicitly prohibited by this MOU or relevant statutes, that are necessary to achieve the objectives as stated in the strategic Plan, Asset Management Plan or Business Plan approved by the councils. Powers to Recommend to Councils: Any other matters under the areas of responsibility of the Business Unit and detailed in the Memorandum of Understanding All recommendations to Council will be subject to adoption of an equivalent resolution by the other Council, unless it is a matter specific to one Council only. |
Attachments
Attachment 1: 1080325921-753 - NRSBU AMP 2024-34 - Final